Faqt testing4/12/2023 ![]() Water test: This procedure simulates the proof of functionality of the system in operation. Personnel safety issues that may apply during the test.ĭuring the FAT following should be covered:Ĭomprehensive inspection: This is typically customized based on the customer’s equipment and requests, but may include a range of conformity checks and checksĬontract audit: This is a summary of the original agreement to ensure that all contractual obligations are met. Specification of the exact configuration of equipment being tested. Specification of the revision levels of the hardware and software to be tested. These should include the following considerations, as a minimum:Ī statement of the location and dates of the FAT. In a logical sequence, every test procedure shall be definedThe general testing procedure should outline the details to be addressed in the test. The methods for conducting the FAT must be well specified and properly documented. Verify all important documents, such as manuals, instructions, plans, drawings, piping and instrumentation diagrams (P&IDs)Įnsure that your equipment or plant performs as expected under the testable range of likely conditions, including mishandling and error. Provide independent proof of functionality, quality and integrity through our comprehensive inspection process The FAT’s purpose test both the BPCS / SIS system’s software and hardware functionality as an integrated unit.Įnsure the product meet all the specifications.įAT saves time and money over fixing issues in the field. The objective is to identify and resolve any system problems before they reach the site of the plant. It is difficult to predict the correct operation of the safety instrumented system or its effects due to defects in certain parts of the safety instrumented system, a FAT provides valuable inspection of these safety problems. ![]() A FAT requires a standardized device testing procedure and is conducted where the final installation is done. Many manufacturers do FAT (Factory Acceptance Test) while adding, modifying or upgrading a system.
0 Comments
Read More
Leave a Reply. |